It depends on the size of the room, whether fixtures move and how long the materials take to arrive. You get a schedule with the written estimate rather than a guess on the phone, and if something behind the wall changes it, you hear that from us the day we find it.
The bathroom we are working on is out of use from demolition until the finishes are in. If it is the only bathroom in the house we plan the sequence around that and tell you in advance which days are the tight ones.
Yes. Supply and drain work, shower valves, new circuits, GFCI protection and lighting are all ours, which is why a bathroom does not sit waiting on another company’s calendar.
Yes, and it is one of the jobs we are asked for most. We deal with the drain, the framing and the waterproofing as part of it, not as extras discovered later.
Moved plumbing, new circuits and structural changes normally do. We pull the permit and schedule the inspections with the building department that covers your town.
We stop, show you what is there, and price the repair before we carry on. Rot and old leaks behind a shower wall are common in older homes, and it is better to see it than to tile over it.